geoidlife.comMaps, tools and the studio behind LaXing
About the LaXing projectOverview, screenshots, and who is behind it · geoidlife.com/laxing
Los Angeles built a modern rail network — then ran it through 223 intersections where trains, cars, and people compete for the same pavement. This is the story of what that costs us every day, told on the map of the city itself.

Ten short films run through this story. They show what words can only describe: a train that cannot swerve, a car turning onto the tracks, a road lifted over the rails, and cities that solved this a century ago. By default each film opens in a viewer and starts playing, sound off, as you scroll to it. If you would rather read without interruption, switch that off here. Every film still opens with one tap on its card, and your choice is remembered on this device.
On: each film opens by itself as you reach it.Independent project by Justin Levy and
GeoidLife · not affiliated with LA DOT or Metro · details
Every dot is a real intersection where a Metro A, E, or K Line train crosses a road at street level — either behind crossing gates or governed by an ordinary traffic light, waiting its turn like a car.

Sources: LA Metro crossing inventory; OpenStreetMap level-crossing data (2026), independently cross-verified.
In downtown Long Beach, on Washington Boulevard, and on Flower Street, trains run in the street. Every crossing here is a negotiation between a 200-ton train and left-turning drivers — refereed only by a traffic light.

It shows in the collision record: over ten years, 144 of 160 train-versus-car collisions happened in street-running territory like this.

In 1993 the agency cut together its first years of near-misses on the new Blue Line. Nothing about the geometry has changed since. Films open in a viewer as you reach them; skip any with one tap, or switch the scrolling films off at the top of the story.
Source: LA Metro Light Rail Operations Update (2018), FY2009–FY2018 collision analysis.
West of Crenshaw, E Line trains cross one signal and cruise at 40–50 mph. East of Crenshaw — the highlighted stretch — they hit seven signals and crawl at 15–30 mph. Same train, same tracks. The only difference is the crossings.

A westbound rush-hour train loses 4½ minutes just sitting at red lights, and the DTLA–Santa Monica trip swings unpredictably from 40 minutes to over an hour.
Sources: Streets For All signal-preemption memo (2026); Metro E Line GPS Speed & Delay Analysis; Metro Customer Journey Mapping study, N=9,227 (2024).
The pulsing markers are crossings on the E Line where Metro's own incident log recorded train collisions with people or vehicles between 2016 and 2018 — Normandie, Crenshaw, Washington/Flower, and more.

One clip, 30 seconds, shown as the news reported it. The driver walked away. Skip it if you would rather not watch.
Gates alone don't solve it: where crossings are gated, car collisions fall but pedestrian collisions concentrate instead — 68 of 86 train-pedestrian collisions happened at gated crossings. Only full separation ends both.
The A (Blue) Line was once labeled the most dangerous light rail line in the nation — about 1.2 accidents per 100,000 train-miles (2018 data). The fully separated B and D subways, running through the same city: zero.
Each collision also means service shut down for hours, trains in the repair shop, and millions of dollars in injury payouts — costs that land on riders and taxpayers alike.
Sources: LA Metro Light Rail Operations Update (2018), line-by-line incident log; LaXing initiative analysis of 2018 Metro accident-rate data.
Grade separation is simply removing the meeting point: the train and the road no longer share the same level, so neither ever waits for — or hits — the other.


What Metro sold in 2001, trains sharing the street with traffic, and what it built at Rosecrans in 2024: the road lifted clean over the tracks.
Any of the three works. What matters is the result: no gates, no red lights for trains, no collisions — the way the C Line and the B/D subways already run today.
Source: LaXing initiative campaign materials (2026).
The green line is the C Line. It runs the same trains, carrying the same Angelenos — but it is fully grade-separated. It has zero street crossings, zero crossing collisions, and zero red-light delay.

Metro’s own footage of lines that never meet a street: the Regional Connector under downtown, and the C Line in the median of the 105, promised to the public in 1993.
This isn't a theory from another city. The fix is already working, today, inside LA Metro's own system.
Sources: LA Metro; OpenStreetMap (2026). Metro's own 2018 analysis: "the lowest number of collisions occur in LRT Automatic Train Operations" — the fully separated mode.
New York grade-separated the approaches to Grand Central in the 1880s — after one too many collisions between trains, pedestrians, and horse carriages — and kept the station running while the tracks went below ground.

Melbourne is doing it right now: its Level Crossing Removal Project has eliminated dozens of crossings with elevated "skyrail" and trenches — and Perth is running a similar program. This is normal infrastructure work, not moonshot engineering.

The streetcars left the street in 1963, the trains came back to it in 1990, and by 2009 the Blue Line’s crossing record was on the evening news. Three films, in order.
Source: LaXing initiative campaign materials (2026); photos via Wikimedia Commons.
Today the A and E Line platforms fit only 3-car trains, and the K Line just 2. Riders describe trains as too crowded — it has made the pages of the LA Times.

The city’s own film on moving Olympic crowds, over a network whose platforms and crossings were never built for them.
The initiative pairs separation with longer platforms for 6-car trains — so the same lines carry roughly twice the people, faster, with room to breathe.
Sources: LaXing initiative campaign materials (2026); Metro Customer Journey Mapping study (2024).
The proposed LA County Safe and Efficient Light Rail Grade Separation Act — headed for the 2028 ballot — would require Metro to fully grade-separate its at-grade light rail from street traffic within 10 years, by redirecting road and freeway capital funds voters already approved (Measure R, 2008 and Measure M, 2016). No new taxes — and because those measures never sunset, road projects resume once the separations are built.

End-to-end travel times drop by up to 40–50%: Long Beach to downtown LA falls from 57 minutes toward 30. Gates disappear from your street. Crossings stop appearing in collision logs — and longer platforms mean 6-car trains with room for the riders that speed will attract.
A citizen-led effort, not sponsored by LA Metro. Data: LA Metro crossing inventory & 2018 Operations Update; Streets For All (2026); Metro Journey Mapping study (2024); OpenStreetMap contributors (ODbL). Map © Mapbox © OpenStreetMap.
Built by geoidlife